A viewpoint from community entirety construction to exam the effect of the programs on evaluating the development of community proposed by public department would be attempted. In the end, looking back from the program of Shuimei Street, it is considered that the development tactic of characterized store street, community construction, industry guidance, bazaar renewed and landscape represented should be preceded simultaneously. The schedule of the program should be suited the measure to local conditions with different case with different condition as well.